group of companies

.

 

       

 

 
Izo-BTS® Process System
 
CONCRETE REPAIRS

PERFORMS GENUINE SOLUTIONS TO PROBLEMS OF THE STRUCTURES

izo-BTS® Process System is the most effective and most economic solution to eliminate corrosion, which spreads through the concrete and decreases the load carrying capacity of the structures.

Due to corrosion or earthquake damages, Anitkabir, Petkim Yarımca Pier, Tugsas Samsun Pier, Tugsas Gemlik Pier, Yapı Kredi Bank Bayramoglu facilities, Turkish Navy Forces' residual areas and after 17 August 1999 Kocaeli Earthquake 28 industrial plants are repaired by Izo-BTS® concrete repair system.

Click for more details

  Korozyona uğramış donatı